SYNEDAT® · Tintri
Tintri – Storage for virtual workloads
SYNEDAT plans Tintri VMstore around virtual workloads and operating goals. Performance, capacity and recovery are assessed per application so storage decisions follow measured needs.

Which product family fits your needs?
Tintri VMstore
Size storage for virtual application needs. SYNEDAT checks hypervisor compatibility, load profiles and migration plans.
Tintri Analytics
Use performance and capacity data for expansion decisions. We compare trends with expected workloads and document assumptions.
Tintri Global Center
Manage multiple VMstore systems with aligned policies. SYNEDAT plans grouping, roles and traceable cross-system changes.
License scope, availability, term and support are reviewed for your project and specified in the quote.
Where the solution adds value
Investigate storage bottlenecks by workload
SYNEDAT measures typical and peak application loads. These define performance goals and a pilot reproducing critical tasks.
Plan migration and recovery together
We organize applications into migration groups and check dependencies. Backup, cutover and rollback are tested before the first production group.
What matters when choosing
- Existing environment
- Identity providers, devices, applications and data locations shape integration. We clarify migration, synchronization and hybrid operating requirements.
- Licenses and ongoing costs
- Users, features, storage and terms influence the quote. We review existing entitlements to avoid unintended overlap.
- Backup and support
- Recovery, patching, monitoring and support need clear ownership. We align recovery objectives, retention and operational services with your needs.
From selection to deployment
Define requirements and objectives
We review systems, users, security requirements and budget. The result is a reasoned selection with a defined scope.
Validate suitability in a pilot
For an agreed pilot, we define tests, acceptance criteria and responsibilities. You receive a documented basis for the investment decision.
Plan rollout and operations
We plan migration, configuration, handover and support together. Scope and responsibilities are agreed before rollout.
Downloads and manufacturer information
Explore your options with the linked service overviews and manufacturer documents. The language shown refers to each document.
-
Tintri VMstore T7200 Series – Data Sheet, April 2026 (PDF)
English
Open PDF: Tintri VMstore T7200 Series – Data Sheet, April 2026 (PDF) (English) ↗
Questions to help you decide
Is capacity alone enough for selection?
No. Latency, peak load, growth and recovery goals affect sizing. SYNEDAT assesses these alongside supported platforms.
Do snapshots replace independent backups?
Snapshots are one recovery component. SYNEDAT also checks independent backups, failure domains and recovery procedures against your requirements.
Can a cloud solution work with on-premises systems?
Often yes; suitability depends on the product, interfaces and architecture. We check identities, network connectivity, data flows and integration limits.
Does cloud service availability replace backup?
Availability and data recovery serve different purposes. We review retention, versioning, deletion scenarios and recovery objectives to determine any additional backup needs.
Can I request a demo or pilot first?
Yes. Tell us your intended use case. We will discuss available evaluation options, prerequisites, effort and acceptance criteria. A pilot is agreed separately before it starts.
What does SYNEDAT need for a quote?
Useful details include product family, deployment location, current systems, user or device count and target date. We clarify open points together and distinguish the product, implementation and ongoing services in the quote.
Can SYNEDAT help with rollout and ongoing operations?
We agree the services you need, such as architecture, integration, migration, documentation or operational support. Vendor support, response times and ongoing assistance are explicitly defined in the agreed scope.